The Hydraulics of Drop Structures and Section 408 Permitting

APA New York Upstate Chapter

#9145600

Wednesday, April 25, 2018
2 p.m. - 2:30 p.m. EDT

CM | 0.50

Add to My Log

Overview

Bergmann provided design and analysis services to support the Alstom Transport Company with obtaining a Corps of Engineers, Section 408 Permit to construct a bridge within the limits of the Hornell Local Flood Control Project.  Alstom has a rail car manufacturing facility in the City of Hornell, NY.  A requirement of Alstom’s contract to build high speed train sets for the Northeast Corridor is construction of a test track at their manufacturing facility.  The length of test track requires the construction of a new single track railroad bridge crossing of the Canisteo River, upstream of an existing double track bridge.

Speakers

Wayne Gannett

Invited Speaker

TBA

Krista Greer

Invited Speaker

TBA

Contact Info

Bill Nechamen, billnechamen@gmail.com